if train rides through, it’ll get destroyed. if it doesn’t, mission accomplished - that segment of track was denied to trains for the time being, then it self-destructed anyway so repairs are necessary. no downsides. the longer variant lasts 2 days, maybe there’s a way to tweak it
if train rides through, it’ll get destroyed. if it doesn’t, mission accomplished - that segment of track was denied to trains for the time being, then it self-destructed anyway so repairs are necessary. no downsides. the longer variant lasts 2 days, maybe there’s a way to tweak it